Sydney Metro Central Station Works

Project description

Location: sydney

 

Transport for NSW has engaged Laing O’Rourke (LOR) as the Managing Contractor to deliver the $955M Central Station Main Works (CSM) program as part of the Sydney Metro project. LOR engaged AGJV, a Joint Venture between Aurecon and GHD, for design services for CSM. Peter was engaged to prepara CCB2 Safety Assurance submission associated with the integrated Preliminary Design Review (PDR) for the Project, reflecting changes to the Project Reference Design as a consequence of the removal of the Central Walk West element of the Works.